What Is Awaab's Law? A Plain-English Guide

Awaab's Law sets legal deadlines for social landlords to fix damp, mould and other hazards. Here's what it means, who it applies to, and the key timescales.

Social Housing

Article

Person removing wallpaper from a corner of a room, revealing mold underneath. They are wearing a white tank top and denim shorts.

If you work for a housing association, council landlord, or registered provider in England, you'll have heard the name by now: Awaab's Law. It's one of the most significant changes to social housing regulation in years, and it carries real legal and financial consequences for landlords who get it wrong. Here's what it actually requires, in plain terms.

Where the law comes from

Awaab's Law is named after Awaab Ishak, a two-year-old boy who died in December 2020 from a respiratory condition caused by prolonged exposure to mould in his family's housing association flat in Rochdale — despite the mould having been repeatedly reported to the landlord. A coroner ruled that his death was directly attributable to the housing conditions, and the case became a national flashpoint for how social landlords handle damp, mould and other hazards.

In response, the government introduced Awaab's Law through the Social Housing (Regulation) Act 2023, giving tenants a legal right to timely repairs and giving landlords fixed, enforceable deadlines for investigating and fixing hazards — rather than the vague "reasonable time" standard that applied previously. The detail of how it works in practice is set out in the government's Awaab's Law guidance for social landlords.

What Awaab's Law actually requires

At its core, Awaab's Law sets fixed maximum timescales that apply once a landlord becomes aware of a hazard:

  • 24 hours — the maximum time to investigate and make safe an emergency hazard (one presenting an imminent risk of harm).
  • 10 working days — the maximum time to investigate a significant hazard, including damp and mould that presents a significant risk of harm.
  • 3 working days — after the investigation concludes, the landlord must give the tenant a written summary of the findings.
  • 5 working days — where a significant hazard is confirmed, safety works must begin within this window.
  • 12 weeks — if repairs can't be completed within the timescales above, the landlord must still begin works within this longer-stop deadline.

Where a property can't be made safe in time, the landlord must offer suitable alternative accommodation at their own expense until it's safe for the tenant to return. Landlords are also expected to keep clear, timestamped records of every stage — reports, correspondence, contractor visits and decisions — since this evidence is what a landlord would need to show the Regulator of Social Housing or the Housing Ombudsman if a complaint or investigation followed.

When does the clock start?

This is one of the most misunderstood parts of the law, and it's where front-line staff matter most. The deadlines start when the landlord becomes aware of a hazard — and that can happen in many ways: a tenant's phone call, a contractor's report, or simply something a housing officer notices during a routine visit. Nobody has to submit a formal complaint for the clock to start. That's why Awaab's Law isn't just a repairs-team issue: any member of staff who takes a report or spots a problem could be the person who starts a legal deadline running.

Who does it apply to?

Awaab's Law applies to social housing let under a tenancy in England — meaning housing associations and local authority (council) landlords. It doesn't apply to homes occupied under a licence, to private rented homes, or to housing in Wales, Scotland or Northern Ireland, although the practical guidance on recognising and preventing hazards remains useful elsewhere.

It's being rolled out in phases, not all at once

Awaab's Law didn't arrive as one single set of rules — it's being phased in over several years, which matters because the requirements you need to train staff on today aren't the full picture of what's coming:

  • Phase 1 (from 27 October 2025): covers all emergency hazards and any damp or mould hazard presenting a significant risk of harm.
  • Phase 2 (from 30 November 2026): extends the same fixed timescales to a wider set of hazards, including excess cold and excess heat, falls, structural collapse and explosions, fire and electrical hazards, and domestic hygiene and food safety. We cover this in detail in our article on what changes under Phase 2.
  • Phase 3 (2027): extends the requirements to essentially all remaining hazards recognised under the Housing Health and Safety Rating System (HHSRS), apart from overcrowding.

That means an organisation that trained its teams thoroughly for Phase 1 could still be caught out when Phase 2 significantly widens what "Awaab's Law compliance" actually covers.

Why this matters beyond legal risk

Damp and mould have been among the most persistent complaint themes the Housing Ombudsman has examined in the social housing sector, which is precisely why Awaab's Law exists: "we'll get to it eventually" was allowed to become normal practice, with devastating consequences in Awaab Ishak's case. Beyond the legal duty, getting this right is about making sure no tenant is left living somewhere that's making them ill while a case sits in a queue.

Making sure your teams are ready

Awaab's Law touches far more roles than most organisations initially expect — not just repairs and maintenance teams, but contact centre staff who log the first report, housing officers who liaise with tenants, surveyors who inspect properties, and compliance leads who need to evidence that timescales were met. Everyone in that chain needs to understand their part in it, because a delay at any single point can be the difference between meeting the legal deadline and breaching it.

Virtual College's Awaab's Law Training for Social Housing course is built for exactly these front-line roles. In around 45 minutes to an hour, across three modules, it explains what the law requires from the moment a hazard is reported or spotted, how to tell an emergency hazard from a significant one, the working-day timescales your organisation must meet, and how to keep the records that demonstrate reasonable endeavours. It's CPD certified and finishes with a short assessment and a downloadable certificate.

For the wider picture on mould itself — how it grows, who's most at risk, and how to prevent it — our Damp and Mould Training Course is a useful companion, and you can browse everything else we offer for the sector in our social housing training courses.

If your organisation needs to train housing management, repairs, and customer service teams together, a Virtual College training subscription gives you access to the full course library, with the reporting you need to evidence completion across every team.